Trinity Preparatory School of Florida
Trinity Preparatory School of Florida’s Nochur Sankar Science Center supports a new era of hands-on learning, discovery, and innovation. Completed in August 2025, the 33,256 SF, two-story facility brings a future-forward STEM experience to the school’s campus in Winter Park, FL.
Client: Trinity Preparatory School of Florida
Project Location: Winter Park, Florida
Completion Date: August 2025
Square Footage: 33,256
Project Intent
Trinity Preparatory School of Florida’s Nochur Sankar Science Center was envisioned as a place where inquiry leads the experience and the environment itself reinforces the spirit of scientific discovery. Rooted in natural science, the design draws inspiration from organic structure, material honesty, and purposeful texture to create spaces that feel both grounded and energizing. Sustainable, durable materials were selected to support active learning while expressing authenticity and resilience, mirroring the iterative nature of experimentation and exploration. The result is a future-ready destination that fosters curiosity, collaboration, and campus connection, offering students an inspiring setting to investigate, test ideas, and thrive. Workscapes provided furniture throughout the center, supporting 9 classrooms, 11 labs, 3 collaboration areas, 3 lobbies, 2 private offices, 1 conference room, and 3 breakrooms.